Falcra Instant by Falcra

Instant by Falcra

Instant Run Sheet

What to do next, who does it and what to use, step by step from preparation to release. It is for the Conductor and the Stage Manager, or your project manager.

The Instant Guide explains each stage and the Instant Practices explain how each step is done. The run sheet puts them in order. It is also a free spreadsheet download, so you can put a name and a date against every step and tick them off as you go.

Available as a spreadsheet

This run sheet is also a free spreadsheet download (Excel), with a status for every step and a summary of what's next. Download instant-run-sheet.xlsx. Free under CC BY 4.0: see Licensing.

Published by Falcra.
The Instant Framework (theinstantframework.com) by Falcra (falcratechnologies.com)

How to use it

  • Work down the stages in order. Each stage ends with a sign-off: record every one in your sign-off register (Guide, chapter 8). The run sheet tracks the work; the register is the record.
  • Skip the steps that don't apply. Those that apply only in some situations say so.
  • Start the long-lead requests in Prepare first. They take weeks inside a large organisation.
  • Repeat the Build steps for each Unit of Work, and the "every session" steps at every Blitz session.
  • In the spreadsheet version, the Summary tab shows the next step not yet done, who leads it and what to use.
S0

Prepare

In short

Led by the Challenger, with the Stage Manager if you have one. Before the Blitz.

StepDoWho leadsUseDone when
S0-01Agree the brief: what you want to build and why.Challenger
With: Business owner
Guide, chapter 6Brief agreed
S0-02Choose the crew option (A Combined, B Split, C Developer Conductor) and whether to add a Stage Manager.Business owner
With: Challenger
Guide, chapter 7
Practices, chapter 1
Crew named
S0-03Choose the Blitz format, consecutive days or split sessions, and book every session (gaps of a week at most).Business owner
With: Stage Manager
Guide, chapter 6Every session booked
S0-04Collect your existing documentation, including earlier work such as BRDs, NFRs and ERDs, and sort it by stage. What belongs where: see S0 in the Guide.Challenger
With: Your experts
Guide, chapter 8Every document assigned to a stage
S0-05Gather your change-control and audit rules.Challenger
With: Technical owner
Guide, chapter 6Rules gathered
S0-06Write the security constraints package.
If you want one.
Security lead
With: Challenger
Practices, chapter 1Package written
S0-07Agree the assurance approach and name the evidence pack signatories: a business owner and a technical owner.Challenger
With: Business owner
Practices, chapter 3
Guide, chapter 9
Both signatories named
S0-08Arrange recording and transcription for every session, and get everyone's agreement.Stage Manager
With: Challenger
Guide, chapter 9Agreement recorded
S0-09Start the long-lead requests (listed under Preparation in the Guide). Filter the Jira backlog on its long-lead label.Stage Manager
With: Roadie
Guide, chapter 6
Practices, chapter 2
Instant Jira backlog (free download)
Every long-lead request lodged
S0-10Existing data: confirm the backup and request read-only database access. A direct connection is preferred; see Practices for why.
If the application replaces or draws on a system that holds data.
Stage Manager
With: Your database administrator
Practices, chapter 2Backup confirmed; access requested
S0-11Set up the board: import the Jira backlog, delete what doesn't apply, and date the milestones from your governance calendar.
If you use Jira.
Stage Manager
With: Conductor
Practices, chapter 1
Instant Jira backlog (free download)
Board loaded and dated
S0-12Set up the sign-off register, with every expected sign-off listed as pending.Stage Manager
With: Conductor
Guide, chapter 8
Instant sign-off timeline (free download)
Every expected sign-off listed
S0-13Complete the readiness checklist.Challenger
With: Stage Manager
Guide, chapter 6Checklist complete

Ends with the readiness checklist is complete.

Repeat

Every Blitz session

In short

Repeat at every session, from Frame to the last Bolt in the Blitz.

StepDoWho leadsUseDone when
1Start recording and transcription. In a split Blitz, the Conductor confirms which stage the AI build tool is at.Conductor
With: Stage Manager
Guide, chapter 6Recording on
2Record your experts' feedback as it happens; note anything the room can't settle for the AI later.ScorekeeperGuide, chapter 7Feedback record up to date
3Short wrap-up at the end of each day.
If you have a Stage Manager.
Stage Manager
With: Crew
Guide, chapter 7Wrap-up held
4Save the transcript and cross-check it against the Scorekeeper's feedback record.Scorekeeper
With: Conductor
Guide, chapter 6Transcript saved and checked
5Split Blitz: settle the open questions between sessions, so nothing waits at the next one.
Split Blitz only.
Stage Manager
With: Challenger
Guide, chapter 6No question left waiting

Each session ends with the transcript is saved and cross-checked.

S1

Frame

In short

Led by the Conductor, with the whole room. First stage of the Blitz.

StepDoWho leadsUseDone when
S1-01Give the AI the brief and the business case or problem statement.ConductorGuide, chapter 8Documents given
S1-02Agree the Intent and scope, as set out under S1 in the Guide.Conductor
With: The whole room
Guide, chapter 8Intent and scope drafted
S1-03Agree the triage policy for features nobody asked for: the default for each kind of addition.Challenger
With: The whole room
Practices, chapter 3Policy agreed
S1-04The room approves the Intent and scope. Record it in the sign-off register.Conductor
With: Stage Manager
Guide, chapter 8Approval recorded

Ends with the room approves the Intent and scope.

S2

Specify

In short

Your experts own the content, the Challenger tests it and the Conductor drives the AI. Mob Elaboration begins.

StepDoWho leadsUseDone when
S2-01Give the AI the documents sorted to this stage (listed under S2 in the Guide).Conductor
With: Challenger, who selects them
Guide, chapter 8Documents given
S2-02Choose requirements or user stories.Business owner
With: Challenger
Practices, chapter 1Choice recorded
S2-03Draft the requirements or user stories with the AI and review them in the room.Your experts
With: Challenger tests; Conductor drives
Guide, chapter 8Reviewed in the room
S2-04Capture the critical rules as decision tables. The AI drafts them; your experts check them.Conductor
With: Your experts
Practices, chapter 3Every critical rule in a decision table
S2-05Give each part of the application a risk tier. The AI proposes; your experts and business owner decide; the Challenger tests the reasons.Your experts and business owner
With: Conductor records
Practices, chapter 1
Instant risk tier register (free download)
Every part has a tier
S2-06Choose the data architecture level, after the six questions are put to the room.Business owner
With: Conductor
Practices, chapter 1Level chosen
S2-07Agree the non-functional requirements: your standards first, and the ten questions put to the business owners.Conductor
With: Business owner
Practices, chapter 2Targets agreed
S2-08Your experts and testers begin writing the acceptance tests.Your experts and testersPractices, chapter 3Tests started
S2-09Gate G1, Spec agreed: the business approves the requirements or user stories in the room. Record it.Business owner
With: Stage Manager records
Guide, chapter 8G1 recorded

Ends with Gate G1, Spec agreed.

S3

Design

In short

Led by the Conductor, with the Roadie on environments and security.

StepDoWho leadsUseDone when
S3-01Give the AI the documents sorted to this stage (listed under S3 in the Guide).Conductor
With: Roadie, for technical material
Guide, chapter 8Documents given
S3-02Design the architecture, components and screen mockups.Conductor
With: Your experts
Guide, chapter 8Design and mockups approved
S3-03Produce the build-readiness spreadsheet: every requirement sorted A Ready, B Code buildable, C Cannot be built, D Source unverified.Conductor
With: Business owner decides each row
Practices, chapter 4No row awaiting a decision
S3-04Approve the Units of Work, Bolts and build order that the AI proposes.Conductor
With: The whole room
Guide, chapter 8Units and order approved
S3-05Set up Git: a branch per Unit of Work, squash on merge, branch protection, and the pull request template.Roadie
With: Conductor
Practices, chapter 3
Instant pull request template (free download)
A direct push to main is refused
S3-06Set up the automated checks, and show each one failing on a deliberately broken case.RoadiePractices, chapter 3Every check's failure test recorded
S3-07Add one tracker item per Unit of Work, plus one Refinements item per unit.
If you use Jira or another tracker.
Stage Manager
With: Conductor
Practices, chapter 3Board shows every unit
S3-08Gate G2, Ready to build: the build-readiness spreadsheet, risk tier register (no tier still proposed) and data architecture level are done. Record it.Conductor and business owner
With: Stage Manager records
Guide, chapter 8G2 recorded

Ends with Gate G2, Ready to build.

S4

Build

In short

Led by the Conductor; your experts decide what appears on screen. Repeat for each Unit of Work.

StepDoWho leadsUseDone when
S4-01Give the AI the unit's decisions, decision tables and mockups.ConductorGuide, chapter 8Documents given
S4-02Build Bolt by Bolt. Your experts decide what appears on screen; Tweaks are made on the spot; commits are saved at checkpoints.Conductor
With: Your experts
Practices, chapter 3Unit built
S4-03Treat any small request that changes behaviour as a rule, not a Tweak: record it as a decision.Conductor
With: Scorekeeper
Practices, chapter 3Every rule recorded
S4-04Explain-back: the AI explains each critical module in plain English; an expert confirms or corrects it.
Units with critical logic.
Conductor
With: Your experts
Practices, chapter 3Explain-backs signed
S4-05Raise one pull request for the unit, with its intent summary filled in from the template.ConductorPractices, chapter 3
Instant pull request template (free download)
Pull request raised
S4-06Independent AI review; resolve every critical finding.Conductor
With: Roadie oversees
Practices, chapter 3Findings resolved
S4-07Human review by risk tier, by a named approver.Named reviewer
With: Roadie oversees
Practices, chapter 3Approval given
S4-08Answer reviewers' questions on the pull request: at the end of each Bolt in the Blitz, at least daily after it.
When questions are raised.
Conductor
With: Scorekeeper, for business questions
Practices, chapter 3No open questions
S4-09Check the unit's feature inventory: triage anything nobody asked for against the agreed policy.Your experts
With: Conductor; Scorekeeper records
Practices, chapter 3Nothing unrequested left undecided
S4-10Gate G3, Unit accepted: tests pass, AI findings resolved, human review done, feature inventory checked. Record it.Named reviewer
With: Stage Manager records
Guide, chapter 8G3 recorded for the unit

Ends with Gate G3 for each unit.

S5

Prove

In short

Led by your business owner and technical owner.

StepDoWho leadsUseDone when
S5-01Give the AI your test standards and change-control evidence requirements.ConductorGuide, chapter 8Documents given
S5-02Settle every feature nobody asked for before user acceptance testing starts.Your experts
With: Conductor
Practices, chapter 3Every item decided
S5-03Run the acceptance tests and user acceptance testing.Your experts and testersGuide, chapter 8Tests passed
S5-04Produce the traceability matrix, checked in both directions.ConductorGuide, chapter 8
Practices, chapter 3
Matrix complete in both directions
S5-05Rehearse the migration until clean, and reconcile counts, totals and samples.
If there is existing data.
Conductor and Roadie
With: Your database administrator and data owners
Practices, chapter 2Reconciliation passed
S5-06Put the production safety nets in place: the audit level chosen, alerts, and hard limits on critical values.Technical owner
With: Roadie
Practices, chapter 3Safety nets in place
S5-07Assemble the evidence pack.Business owner and technical owner
With: Conductor
Practices, chapter 3Pack complete
S5-08Gate G4, Go-live: your business owner and technical owner sign the evidence pack. Record it.Business owner and technical owner
With: Stage Manager records
Guide, chapter 8G4 recorded

Ends with Gate G4, Go-live.

S6

Release and refine

In short

Led by your technical owner and operations team, under your release and change process.

StepDoWho leadsUseDone when
S6-01Give the AI your release, change and operational handover requirements.Conductor
With: Roadie
Guide, chapter 8Documents given
S6-02Release through Test and UAT to production, with the change request, cutover and hypercare coordinated.Technical owner and operations
With: Stage Manager
Guide, chapter 8
Guide, chapter 7
In production
S6-03Produce the Information Model and the Data Model.Conductor
With: Technical owner reviews
Practices, chapter 1
Instant Information Model (free download)
Instant Data Model (free download)
Both reviewed
S6-04One or two experts refine the build; what they learn feeds the next Frame.Your experts
With: Conductor
Guide, chapter 6Refinements logged
S6-05Keep monitoring and sampling, and give each significant release its own evidence.
After go-live.
Technical ownerPractices, chapter 3Ongoing
S6-06The release is approved under your change process. Record it.Technical owner
With: Stage Manager records
Guide, chapter 8Approval recorded

Ends with the release is approved under your change process.